1 photo
1 photo
Construction Needed for Pond Spillway
Monterey, TN
back
I need the emergency spillway on my farm pond rebuilt ASAP before the rains start back. Need it to be constructed using either concrete blocks filled with concrete or formed concrete. It will require the use of small excavator to dig out a trench. I suppose it could be dug out by hand. Need someone experienced in construction.
The photo shows what currently exist. It was washed out about a year and a half ago.
Call or text if it is something you would be interested in.
The photo shows what currently exist. It was washed out about a year and a half ago.
Call or text if it is something you would be interested in.
read more
Featured Ads in Professional Services
back
Seller
Ad Details
Ad # | 20412455 |
Category | Professional Services |
Posted | October 27, 2024 4:41 pm |
Ends | December 26 2024 3:41 pm |
Views | 336 |
Seller | 3CreeksRanch |
Avoid Fraud, meet sellers face to face. Never send money up front. Report suspicious Ads.
3CreeksRanch
Related Featured Ads are displayed at the bottom of all basic listings.
more about Featured Ads
Smart Account advantages:
- Post up to 25 Ads at one time
- 20 photos per Ad
- Discount pricing on Ad Extras
- 10 free Credits with each renewal
- $12.95 for 30 days